Wednesday, March 18, 2020

SPACE SHUTTLE AND HİSTORY

 - SPACE SHUTTLE AND HİSTORY - 

The Space Shuttle is a partially reusable low Earth orbital spacecraft system that was operated from 1981 to 2011 by the U.S. National Aeronautics and Space Administration (NASA) as part of the Space Shuttle program. Its official program name was Space Transportation System (STS), taken from a 1969 plan for a system of reusable spacecraft of which it was the only item funded for development.The first of four orbital test flights occurred in 1981, leading to operational flights beginning in 1982. In addition to the prototype whose completion was cancelled, five complete Shuttle systems were built and used on a total of 135 missions from 1981 to 2011, launched from the Kennedy Space Center (KSC) in Florida. Operational missions launched numerous satellites, interplanetary probes, and the Hubble Space Telescope (HST); conducted science experiments in orbit; and participated in construction and servicing of the International Space Station. The Shuttle fleet's total mission time was 1322 days, 19 hours, 21 minutes and 23 seconds.



Shuttle components include the Orbiter Vehicle (OV) with three clustered Rocketdyne RS-25 main engines, a pair of recoverable solid rocket boosters (SRBs), and the expendable external tank (ET) containing liquid hydrogen and liquid oxygen. The Space Shuttle was launched vertically, like a conventional rocket, with the two SRBs operating in parallel with the OV's three main engines, which were fueled from the ET. The SRBs were jettisoned before the vehicle reached orbit, and the ET was jettisoned just before orbit insertion, which used the orbiter's two Orbital Maneuvering System (OMS) engines. At the conclusion of the mission, the orbiter fired its OMS to deorbit and reenter the atmosphere. The orbiter then glided as a spaceplane to a runway landing, usually to the Shuttle Landing Facility at Kennedy Space Center, Florida or Rogers Dry Lake in Edwards Air Force Base, California. After landing at Edwards, the orbiter was flown back to the KSC on the Shuttle Carrier Aircraft, a specially modified Boeing 747.

The first orbiter, Enterprise, was built in 1976, used in Approach and Landing Tests and has no orbital capability. Four fully operational orbiters were initially built: Columbia, Challenger, Discovery, and Atlantis. Of these, two were lost in mission accidents: Challenger in 1986 and Columbia in 2003, with a total of fourteen astronauts killed. A fifth operational (and sixth in total) orbiter, Endeavour, was built in 1991 to replace Challenger. The Space Shuttle was retired from service upon the conclusion of Atlantis's final flight on July 21, 2011. The U.S. has since relied on the Russian Soyuz spacecraft to transport astronauts to the International Space Station, pending the Commercial Crew Development and Space Launch System programs with flights to begin in the 2020s.

Design And Development

During the 1950s, the United States Air Force proposed using a reusable piloted glider to perform military operations such as reconnaissance, satellite attack, and employing air-to-ground weapons. In the late-1950s, the Air Force began developing the partially reusable X-20 Dyna-Soar. The Air Force collaborated with NASA on the Dyna-Soar, and began training six pilots in June 1961. The rising costs of development and the prioritization of Project Gemini led to the cancellation of the Dyna-Soar program in December 1963. In addition to the Dyna-Soar, the Air Force conducted a study in 1957 to test the feasibility of reusable boosters. This became the basis for the aerospaceplane, a fully reusable spacecraft that was never developed beyond the initial design phase in 1962–1963.

Beginning in the early 1950s, NASA and the Air Force collaborated on developing lifting bodies to test aircraft that primarily generated lift from their fuselages instead of wings, and tested the M2-F1, M2-F2, M2-F3, HL-10, X-24A, and the X-24B. The program tested aerodynamic characteristics that would later be applied to the Space Shuttle, including unpowered landing from a high altitude and speed.

Design Process

In September 1966, NASA and the Air Force released a joint study concluding that a new vehicle was required to satisfy their respective future demands, and that a partially reusable system would be the most cost-effective solution.The head of the NASA Office of Manned Space Flight, George Mueller, announced the plan for a reusable shuttle on August 10, 1968. NASA issued a request for proposal (RFP) for designs of the Integrated Launch and Re-entry Vehicle (ILRV), which would later become the Space Shuttle. Rather than award a contract based upon initial proposals, NASA announced a phased approach for the Space Shuttle contracting and development; Phase A was a request for studies completed by competing aerospace companies, Phase B was a competition between two contractors for a specific contract, Phase C involved designing the details of the spacecraft components, and Phase D was the production of the spacecraft.



In December 1968, NASA created the Space Shuttle Task Group to determine the optimal design for a reusable spacecraft, and issued study contracts to General Dynamics, Lockheed, McDonnell Douglas, and North American Rockwell. In July 1969, the Space Shuttle Task Group issued a report that determined the Shuttle would support a space station, launch, service, and retrieve satellites, and support short-duration crewed missions. The report also created three classes of a future reusable shuttle: Class I would have a reusable orbiter mounted on expendable boosters, Class II would use stage-and-a-half staging, and Class III would have both a reusable orbiter and a reusable booster. In September 1969, the Space Task Group, under leadership of Vice President Spiro Agnew, issued a report calling for the development of a space shuttle to bring people and cargo to low Earth orbit (LEO), as well as a space tug for transfers between orbits and the Moon, and a reusable nuclear stage for deep space travel.

After the release of the Space Shuttle Task Group report, many aerospace engineers favored the Class III, fully reusable design because of perceived savings in hardware costs. Max Faget, a NASA engineer who had worked to design the Mercury capsule, patented a design for a two-stage fully recoverable system with a straight-winged orbiter mounted on a larger straight-winged booster.The Air Force Flight Dynamics Laboratory argued that a straight-wing design would not be able to withstand the high thermal and aerodynamic stresses during reentry, and would not provide the required cross-range capability. Additionally, the Air Force required a larger payload capacity than Faget's design allowed. In January 1971, NASA and Air Force leadership decided that a reusable delta-wing orbiter mounted on an expendable propellant tank would be the optimal design for the Space Shuttle.

After establishing the need for a reusable, heavy-lift spacecraft, NASA and the Air Force began determining the design requirements of their respective services. The Air Force expected to launch large satellites into a polar orbit, and that the Space Shuttle have a 4.6-meter (15 ft) by 18-meter (60 ft) foot payload bay, 1,800-kilometer (1,100 mi) cross-range, and the capacity to lift 29,000-kilogram (65,000 lb) to an easterly low Earth orbit, and 18,000-kilogram (40,000 lb) into polar orbit. NASA evaluated the F-1 and J-2 engines from the Saturn rockets, and determined that they were insufficient for the requirements of the Space Shuttle, and in July 1971, it issued a contract to Rocketdyne to begin development on the RS-25 engine.

NASA reviewed 29 potential designs for the Space Shuttle. NASA determined that a design with two side boosters should be used, and the boosters should be reusable to reduce costs. NASA and the Air Force elected to use solid-propellant boosters because of the lower costs and the ease of refurbishing them for reuse after they landed in the ocean. In January 1972, President Richard Nixon approved the Shuttle, and NASA decided on its final design in March. In August 1972, NASA awarded the contract to build the orbiter to North American Rockwell, the solid-rocket booster contract to Morton Thiokol, and the external tank contract to Martin Marietta.

Development

On June 4, 1974, Rockwell began construction on the first shuttle, Orbiter Vehicle (OV)-101, which would later be named Enterprise. Enterprise was designed as a test vehicle, and did not include engines or heat shielding. Construction was completed on September 17, 1976, and Enterprise was moved to Edwards AFB to begin testing. Rockwell also constructed the Main Propulsion Test Article (MPTA)-098, which was later fit with RS-25 engines and tested at the National Space Technology Laboratory (NSTL). Rockwell conducted structural tests on Structural Test Article (STA)-099 to determine the effect of aerodynamic stresses.

The beginning of the development of the RS-25 Space Shuttle Main Engine was delayed for nine months while Pratt & Whitney challenged the contract that had been issued to Rocketdyne. The first engine was completed in March 1975, after issues with developing the first throttlable, reusable engine. During engine testing, the RS-25 experienced multiple nozzle failures, as well as broken turbine blades. Despite the problems during testing, NASA ordered the nine RS-25 engines needed for its three orbiters under construction in May 1978.

NASA experienced significant delays in the development of the Space Shuttle's thermal protection system. Previous NASA spacecraft had used ablative heat shields, but those could not be reused. NASA chose to use ceramic tiles for thermal protection, as the shuttle could then be constructed of lightweight aluminum, and the tiles could be individually replaced as needed. Construction began on Columbia on March 27, 1975, and it was delivered to the Kennedy Space Center (KSC) on March 25, 1979. At the time of its arrival at the KSC, Columbia still had 6,000 of its 30,000 tiles remaining to be installed. However, many of the tiles that had been originally installed had to be replaced, requiring two years of installation before Columbia could fly.

On January 5, 1979, NASA commissioned a second orbiter. Later that month, Rockwell began converting STA-099 to OV-099, later named Challenger. On January 29, 1979, NASA ordered two additional orbiters, OV-103 and OV-104, which were named Discovery and Atlantis. Construction of OV-105, later named Endeavour, began in February 1982, but NASA decided to limit the Space Shuttle fleet to four orbiters in 1983. After the loss of Challenger, NASA resumed production of Endeavour in September 1987.

Testing

After it arrived at Edwards AFB, Enterprise underwent flight testing with the Shuttle Carrier Aircraft, a Boeing 747 that had been modified to carry the orbiter. In February 1977, Enterprise began the Approach and Landing Tests and underwent captive flights, where it remained attached to the Shuttle Carrier Aircraft for the duration of the flight. On August 12, 1977, Enterprise conducted its first glide test, where it detached from the Shuttle Carrier Aircraft and landed at Edwards AFB. After four additional flights, Enterprise was moved to the Marshall Space Flight Center on March 13, 1978. Enterprise underwent shake tests in the Mated Vertical Ground Vibration Test, where it was attached to an external tank and solid rocket boosters, and underwent vibrations to simulate the stresses of launch. In April 1979, Enterprise was taken to the Kennedy Space Center, where it was attached to an external tank and solid rocket boosters, and moved to LC-39. Once installed at the launch pad, the Space Shuttle was used to verify the proper positioning of launch complex hardware. Enterprise was taken back to California in August 1979, and later served in the development of the SLC-6 at Vandenberg AFB in 1984.

On November 26, 1980, Columbia was mated with its external tank and solid-rocket boosters, and was moved to LC-39 on December 29, 1980. The first Space Shuttle mission, STS-1, would be the first time NASA performed a crewed first-flight of a spacecraft. On April 12, 1981, the Space Shuttle launched for the first time, and was piloted by John Young and Robert Crippen. During the two-day mission, Young and Crippen tested equipment on board the shuttle, and found several of the ceramic tiles had fallen off the top side of the Columbia. NASA coordinated with the Air Force to use satellites to image the underside of Columbia, and determined there was no damage. Columbia reentered the atmosphere on April 14, and landed at Edwards AFB.

NASA conducted three additional test flights with Columbia in 1981 and 1982. On July 4, 1982, STS-4, flown by Ken Mattingly and Henry Hartsfield, landed at Edwards AFB. President Ronald Reagan and his wife Nancy met the crew, and delivered a speech. After STS-4, NASA declared the Space Shuttle operational.

Description

The Space Shuttle was the first operational orbital spacecraft designed for reuse. Each Space Shuttle orbiter was designed for a projected lifespan of 100 launches or ten years of operational life, although this was later extended.At launch, it consisted of the orbiter, which contained the crew and payload, the external tank (ET), and the two solid rocket boosters (SRBs).

Responsibility for the Shuttle components was spread among multiple NASA field centers. The Kennedy Space Center was responsible for launch, landing and turnaround operations for equatorial orbits (the only orbit profile actually used in the program), the U.S. Air Force at the Vandenberg Air Force Base was responsible for launch, landing and turnaround operations for polar orbits (though this was never used), the Johnson Space Center served as the central point for all Shuttle operations, the Marshall Space Flight Center was responsible for the main engines, external tank, and solid rocket boosters, the John C. Stennis Space Center handled main engine testing, and the Goddard Space Flight Center managed the global tracking network.

Space Shuttle Orbiter

The orbiter had design elements and capabilities of both a rocket and an aircraft to allow it to launch vertically and then land as a glider. Its three-part fuselage provided support for the crew compartment, cargo bay, flight surfaces, and engines. The rear of the orbiter contained the Space Shuttle Main Engines (SSME), which provided thrust during launch, as well as the Orbital Maneuvering System (OMS), which allowed the orbiter to achieve, alter, and exit its orbit once in space. Its double-delta wings were 18-meter (60 ft) long, and were swept 81° at the inner leading edge and 45° at the outer leading edge. Each wing had an inboard and outboard elevon to provide flight control during reentry, along with a flap located between the wings, below the engines to control pitch. The orbiter's vertical stabilizer was swept backwards at 45°, and contained a rudder that could split to act as a . The vertical stabilizer also contained a two-part drag parachute system to slow the orbiter after landing. The orbiter used retractable landing gear with a nose landing gear and two main landing gear, each containing two tires. The main landing gear contained two brake assemblies each, and the nose landing gear contained an electro-hydraulic steering mechanism.

Four operational OVs were originally built. Following the construction of Columbia (OV-102) and the conversion of Challenger (OV-099) to a flyable spacecraft, Discovery (OV-103) and Atlantis (OV-104) were ordered in January 1979. After the Challenger disaster in January 1986, NASA ordered a fifth OV, Endeavour (OV-105) in July 1987. Endeavour was primarily built from structural spares that were created during the construction of Discovery and Atlantis.

Crew Compartment

The crew compartment comprised three decks, and was the pressurized, habitable area on all Space Shuttle missions. The cockpit consisted of two seats for the commander and pilot, as well as an additional two to four seats for crew members. The mid-deck is located below the cockpit, and is where the galley and crew bunks were set up, as well as three or four crew member seats. The mid-deck contained the airlock, which could support two astronauts on an (EVA), as well as access to pressurized research modules. An equipment bay was below the mid-deck, which stored environmental control and waste management systems.

On the first four Shuttle missions, astronauts wore modified U.S. Air Force high-altitude full-pressure suits, which included a full-pressure helmet during ascent and descent. From the fifth flight, STS-5, Challenger, the crew wore one-piece light blue nomex flight suits and partial-pressure helmets. After the Challenger disaster, the crew members wore the Launch Entry Suit (LES), a partial-pressure version of the high-altitude pressure suits with a helmet. In 1994, the LES was replaced by the full-pressure Advanced Crew Escape Suit (ACES), which improved the safety of the astronauts in an emergency situation. Columbia originally had modified SR-71zero-zero ejection seats installed for the ALT and first four missions, but these were disabled after STS-4 and removed after STS-9.



The flight deck was the top level of the crew compartment, and contained the flight controls for the orbiter. The commander sat in the front left seat, and the pilot sat in the front right seat, with two to four additional seats set up for additional crew members. The instrument panels contained over 2,100 displays and controls, and the commander and pilot were both equipped with a heads-up display (HUD) and a Rotational Hand Controller (RHC) to gimbal the engines during powered flight and fly the orbiter during unpowered flight. Both seats also had rudder controls, to allow rudder movement in flight and nose-wheel steering on the ground. The orbiter vehicles were originally installed with the Multifunction CRT Display System (MCDS) to display and control flight information. The MCDS displayed the flight information at the commander and pilot seats, as well as at the after seating location, and also controlled the data on the HUD. 1998 Atlantis was upgraded with the Multifunction Electronic Display System (MEDS), which was a upgrade to the flight instruments that replaced the eight MCDS display units with 11 multifunction colored digital screens. MEDS was flown for the first time in May 2000 on STS-98, and the other orbiter vehicles were upgraded to it. The aft section of the flight decked contained windows looking into the payload bay, as well as an RHC to control the Remote Manipulator System. Additionally, the aft flight deck had monitors for a closed-circuit television.

The mid-deck was located underneath the flight deck. It contained the crew equipment storage, as well as the sleeping and hygiene stations for the crew. The mid-deck contained seats for three crewmembers (Columbia's mid-deck could seat four) during launch and landing procedures. The crew typically slept on the mid-deck, which also housed the galley, medical equipment, bathroom, and exercise equipment. The mid-deck contained modular lockers to store equipment that could be scaled depending on the needs of the crew, as well as permanently installed floor compartments. The mid-deck contained a port-side hatch that crew used for entry and exit while on Earth. Additionally, each orbiter was originally installed with an internal airlock in the mid-deck. The internal airlock was replaced with an external airlock in the payload bay on Discovery, Atlantis, and Endeavour to improve docking with Mir and the ISS, along with the Orbiter Docking System.

Flight Systems

The orbiter was equipped with an avionics system to provide information and control during atmospheric flight. Its avionics suite contained three microwave scanning beam landing systems, three gyroscopes, three TACANs, three accelerometers, two radar altimeters, two barometric altimeters, three attitude indicators, two Mach indicators, and two Mode C transponders. During reentry, the crew deployed two air data probes once they were travelling slower than Mach 5. The orbiter had three inertial measuring units (IMU) that it used for guidance and navigation during all phases of flight. The orbiter contains two star trackers to align the IMUs while in orbit. The star trackers are deployed while in orbit, and can automatically or manually align on a star. In 1991, NASA began upgrading the inertial measurement units with an inertial navigation system (INS), which provided more accurate location information. In 1993, NASA flew a GPS receiver for the first time aboard STS-51. In 1997, Honeywell began developing an integrated GPS/INS to replace the IMU, INS, and TACAN systems, which first flew on STS-118 in August 2007

While in orbit, the crew primarily communicated using one of four S-band radios, which provided both voice and data communications. Two of the S band radios were phase modulation transceivers, and could transmit and receive information. The other two S band radios were frequency modulation transmitters, and were used to transmit data to NASA. As S band radios can operate only within their line of sight, NASA used the Tracking and Data Relay Satellite System and the Spacecraft Tracking and Data Acquisition Network ground stations to communicate with the orbiter throughout its orbit. Additionally, the orbiter deployed a high-bandwidth Ku-band radio out of the cargo bay, which could also utilized as a rendezvous radar. The orbiter was also equipped with two UHF radios for communications with air traffic control and astronauts conducting extravehicular activity.

Although the orbiter could not be flown without a crew, its fly-by-wire control system was entirely reliant on its main computer, the Data Processing System (DPS). The DPS controlled the flight controls and thrusters on the orbiter vehicle, as well as the ET and SRBs during launch. The DPS consisted of five general purpose computers (GPC), two magnetic tape mass memory units (MMUs), and the associated sensors to monitors the Space Shuttle components. The original GPC used was the IBM AP-101B, which used a separate central processing unit (CPU) and inputer/output processor (IOP), and non-volatile solid-state memory. From 1991 to 1993, the orbiter vehicles were upgraded to the AP-101S, which improved the memory and processing capabilities, and reduced the volume and weight of the computers by combining the CPU and IOP into a single unit. Four of the GPCs were loaded with the Primary Avionics Software System (PASS), which was Space Shuttle-specific software that provided control through all phases of flight. During ascent, maneuvring, reentry, and landing, the four PASS GPCs functioned identically to produce quadruple redundancy, and would error check their results. In case of a software error that would cause erroneous reports from the four PASS GPCs, a fifth GPC ran the Backup Flight System, which used a different program and could control the Space Shuttle through ascent, orbit, and reentry, but could not support an entire mission. The five GPCs were separated in three separate bays within the mid-deck to provide redundancy in the event of a cooling fan failure. After achieving orbit, the crew would switch some of the GPCs functions from guidance, navigation, and control (GNC) to systems management (SM) and payload (PL) to support the operational mission.The Space Shuttle was not launched if its flight would run from December to January, as its flight software would have required the orbiter vehicle's computers to be reset at the year change. In 2007, NASA engineers devised a solution so Space Shuttle flights could cross the year-end boundary.

Space Shuttle missions typically brought a portable general support computer (PGSC) that could integrate with the orbiter vehicle's computers and communication suite, as well as monitor scientific and payload data. Early missions brought the Grid Compass, one of the first laptop computers, as the PGSC, but later missions brought Apple and Intel laptops.


Payload Bay

The payload bay comprised most of the orbiter vehicle's fuselage, and provided the cargo-carrying space for the Space Shuttle's payloads. It was 18-meter (60 ft) long and 4.6-meter (15 ft) wide, and was the could accommodate cylindrical payloads up to 15 feet (4.6 m) in diameter. These measurements were chosen specifically to accommodate the KH-9 HEXAGON spy satellite operated by the National Reconnaissance Office.Two payload bay doors hinged on either side of the bay, and provided a relatively airtight seal to protect payloads from heating during launch and reentry. Payloads were secured the in the payload bay to the attachment points on the longerons. The payload bay doors served an additional function as radiators for the orbiter vehicle's heat, and were opened upon reaching orbit for heat rejection.

The orbiter could be used in conjunction with a variety of add-on components depending on the mission. This included orbital laboratories (Spacelab, Spacehab), boosters for launching payloads farther into space (Inertial Upper Stage, Payload Assist Module), and other functions, such as provided by Extended Duration Orbiter, Multi-Purpose Logistics Modules, or Canadarm (RMS). An upper stage called Transfer Orbit Stage (Orbital Science Corp. TOS-21) was also used once with the orbiter.Other types of systems and racks were part of the modular Spacelab system —pallets, igloo, IPS, etc., which also supported special missions such as SRTM.[36] To limit the fuel conseumption while the orbiter vehicle was docked at the ISS, the Station-to-Shuttle Power Transfer System (SSPTS) was installed on Discovery and Endeavour. The SSPTS was first used on STS-118, and allowed the orbiter vehicle to be power by the ISS's power supply.

Remote Manipulator System

The Remote Manipulator System (RMS), also known as Canadarm, was a mechanical arm attached to the cargo bay. It could be used to grasp and manipulate payloads, as well as serve as a mobile platform for astronauts conducting an Extravehicular activity (EVA). The RMS was built by the Canadian company Spar Aerospace, and was controlled by an astronaut inside the orbiter's flight deck using their windows and closed-circuit television. The RMS allowed for six-degrees of freedom, and had six joints located at three points along the arm. The original RMS could deploy or retrieve payloads up to 65,000 pounds (29,000 kg), which was later improved to 586,000 pounds (270,000 kg)

Spacelab

In 1973, European ministers met in Belgium to authorize the Spacelab program, which was a European multidisciplinary orbital space laboratory that flew in the payload bay.Spacelab provided a modular, pressurized laboratory for use in orbit. The Spacelab module contained two 2.7 m (9 ft) segments that were mounted in the aft end of the payload bay to maintain the center of gravity during flight. Astronauts entered the Spacelab module through a 2.7 m (8.72 ft) or 5.8 m (18.88 ft) tunnel that connected to the airlock. The Spacelab equipment was primarily stored in pallets, which provided storage for both experiments as well as computer and power equipment. Spacelab hardware was flown on 28 missions through 1999, and studied subjects including astronomy, microgravity, radar, and life sciences.Spacelab hardware also supported missions such as Hubble Space Telescope (HST) servicing and space station resupply.STS-2 and STS-3 provided testing, and the first full mission was Spacelab-1 (STS-9) launched on November 28, 1983.Germany funded the Spacelab missions D1 and D2.In addition to the European Space Agency, Japan also partially funded research during the SL-J mission.

RS-25 Engines

Three RS-25 engines, also known as the Space Shuttle Main Engines (SSME), were mounted on the orbiter's aft fuselage in a triangular pattern. The engine nozzles could gimbal ±10.5° in pitch, and ±8.5° in yaw during ascent to change the direction of their thrust to steer the Shuttle. The titanium alloy reusable engines were independent from the orbiter vehicle, and would be removed and replaced in between flights. The RS-25 is a staged-combustion cycle cryogenic engine that used liquid oxygen and hydrogen that had a higher chamber pressure than any previous liquid rocket. The original main combustion chamber operated at a maximum pressure of 22,650 kilopascals (3,285 psi), which was reduced to 20,750 kilopascals (3,010 psi) on the Block II RS-25 engine, which had a larger throat area. The engine nozzle is 287 centimeters (113 in) tall and has an interior diameter of 229 centimeters (90.3 in). The nozzle is cooled by 1,080 interior lines carrying liquid hydrogen, and were additionally protected by insulative and ablative material.



The RS-25 engines had several improvements to enhance reliability and power. During the development program, Rocketdyne determined that the engine was capable of safe reliable operation at 104% of the originally specified thrust. To keep the engine thrust values consistent with previous documentation and software, NASA kept the original specified thrust as 100%, but had the RS-25 operate at higher thrust. RS-25 upgrade versions were denoted as Block I and Block II. 109% thrust level was achieved with the Block II engines in 2001. The normal maximum throttle was 104 percent, with 106% or 109% used for mission aborts.

Orbital Maneuvering System

The Orbital Maneuvering System (OMS) consisted of two aft-mounted AJ10-190 engines and the associated fuel pods. The AJ10 engines used monomethylhydrazine (MMH) oxidized by dinitrogen tetroxide (N2O4).The pods carried a maximum of 2,140 kg (4,718 lb) of MMH and 3,526 kg (7,773 lb) of N2O4.[48] The OMS engines were used after main engine cut-off (MECO) for orbital insertion. Throughout the flight, they were used for orbit changes, as well as the deorbit burn prior to reentry. Each OMS engine produced 27,080 N (6,087 lbf) of thrust, and the entire system could provide 305 m/s (1,000 ft/s) of velocity change, of which 152 m/s (500 ft/s) was used during orbital insertion.

Thermal Protection System

The orbiter was protected from heat during reentry by the Thermal Protection System (TPS), a thermal soaking protective layer around the orbiter. In contrast with previous US spacecraft, which had used ablative heat shields, the reusability of the orbiter required a multi-use heat shield.During reentry, the TPS experienced temperatures up to 1,600 °C (3,000 °F), but had to keep the orbiter vehicle's aluminum skin temperature below 180 °C (350 °F). The TPS primarily consisted of four types of tiles. The nose cone and leading edges of the wings experiences temperatures above 1,300 °C (2,300 °F), and were protected by reinforced carbon-carbon tiles (RCC). Thicker RCC tiles were developed and installed in 1998 to prevent damage from micrometeoroid and orbital debris, and were further improved after RCC damage due to impact was the cause of the Columbia disaster. Beginning with STS-114, the orbiter vehicles were equipped with the wing leading edge impact detection system to alert the crew to any potential damage. The entire underside of the orbiter vehicle, as well as the other hottest surfaces, were protected with high-temperature reusable surface insulation. Areas on the upper parts of the orbiter vehicle were coated in a white low-temperature reusable surface insulation, which provided protection for temperatures below 650 °C (1,200 °F). The payload bay doors and parts of the upper wing surfaces were coated in felt reusable surface insulation, as the temperature there remained below 370 °C (700 °F).

External Tank

The Space Shuttle external tank carried the propellant for the Space Shuttle Main Engines, and connected the orbiter vehicle with the solid rocket boosters. The external tank was 47 m (153.8 ft) tall and 8.4 m (27.6 ft) in diameter, and contained separate tanks for liquid oxygen (LO2) and liquid hydrogren (LH2). The LO2 tank was housed in the nose of the external tank, and was 15 m (49.3 ft) tall. The LH2 comprised the bulk of the external tank, and was 29 m (96.7 ft) tall. The orbiter vehicle was attached to the external tank at two umbilical plates, which contained five propellant and two electrical umbilicals, and forward and aft structural attachments. The exterior of the external tank was covered in orange spray-on foam to allow it to survive the heat of ascent.

The external tank provided propellant to the Space Shuttle Main Engines from liftoff until main engine cutoff. The external tank separated from the orbiter vehicle 18 seconds after engine cutoff, and could be triggered automatically or manually. At the time of separation, the orbiter vehicle retracts its umbilical plates, and the umbilical cords are sealed to prevent excess propellant from venting into the orbiter vehicle. After the bolts attached at the structural attachments are sheared, the external tank separated from the orbiter vehicle. At the time of separation, gaseous oxygen was vented from the nose to cause the external tank to tumble, ensuring that it would break up upon reentry. The external tank was the only major component of the Space Shuttle system that was not reused, and it would travel ballistic trajectory into the Indian or Pacific Ocean.



For the first two missions, STS-1 and STS-2, the external tank was covered in 270 kg (595 lb) of white Fire-Retardant Latex to provide further thermal insulation, but was determined to be unnecessary and removed, increasing the overall payload capacity.A light-weight tank (LWT) was first flown on STS-6, which reduced tank weight by 4,700 kg (10,300 lb)[53] The LWT's weight was reduced by removing components from the LH2 tank and reducing the thickness of some skin panels. In 1998, a super light-weight external tank (SLWT) first flew on STS-91. The SLWT used the 2195 aluminum-lithium alloy, which was 40% stronger and 10% less dense than its predecessor, 2219 aluminum-lithium alloy. The SLWT weighed 3,400 kg (7,500 lb) less than the LWT, which allowed the Space Shuttle to deliver heavy elements to ISS's high inclination orbit. The significant weight reduction of the external tank caused a shift in the center of gravity, which would have resulted in throttling down of the Space Shuttle Main Engines in an abort to orbit scenario.

Solid Rocket Boosters

The solid rocket boosters (SRB) provided 71.4% of the Space Shuttle's thrust during liftoff and ascent. They were the largest solid rocket motors ever flown, and the first solid rocket motors used on a crewed spacecraft.Each SRBs was 45 m (149.2 ft) tall and 3.7 m (12.2 ft) wide, weighed 68,000 kg (150,000 lb), and had a steel exterior approximately 13 mm (.5 in) thick.The SRB's subcomponents were the solid rocket motor, nose cone, and rocket nozzle. The solid rocket motor comprised the majority of the SRB's structure, and consisted of 11 steel sections. The nose cone primarily houses the parachute systems that were used during recovery, as well as the forward separation motors. The rocket nozzles used a de Laval nozzle design, and could gimbal up to 8°.

The rocket motors were each filled with a total 570,000 kg (1,250,000 lb) of solid rocket propellant, and joined together at the Vehicle Assembly Building at the Kennedy Space Center. In addition to providing thrust during the first stage of launch, the SRBs provided structural support for the orbiter vehicle and ET, as they were the only system that was connect to the mobile launcher platform. At the time of launch, the SRBs were armed at T-5 minutes, and could only be electrically ignited once the RS-25 engines had ignited and were without issue. They each provided 12,500 kN (2,800,000 lbf) of thrust, which was later improved to 13,300 kN (3,000,000 lbf) beginning on STS-8.After expending their fuel, the SRBs were jettisoned two minutes after launch at an altitude of approximately 46 km (150,000 ft). Following separation, they deployed drogue and main parachutes, landed in the ocean, and were recovered by the crews aboard the ships MV Freedom Star and MV Liberty Star. Once they were returned to Cape Canaveral, they were cleaned and disassembled. The rocket motor, igniter, and nozzle were then shipped to Thiokol to be refurbished and reused on subsequent flights.


The SRBs underwent several redesigns throughout the program's lifetime. STS-6 and STS-7 used that were 2,300 kg (5,000 lb) lighter than the standard-weight cases due to walls that were 0.10 mm (.004 in) thinner, but were determined to be too thin. Subsequent flights until STS-26 used cases that were 0.076 mm (.003 in) thinner than the standard-weight cases, which saved 1,800 kg (4,000 lb). After the Challenger disaster as a result of a failed O-ring in cold temperature, the SRBs were redesigned to provide a constant seal regardless of the ambient temperature.

Specifications

Orbiter (for Endeavour, OV-105)

Length: 122.17 ft (37.237 m)
Wingspan: 78.06 ft (23.79 m)
Height: 56.58 ft (17.25 m)
Empty weight: 172,000 lb (78,000 kg)[58]
Gross liftoff weight (Orbiter only): 240,000 lb (110,000 kg)
Maximum landing weight: 230,000 lb (100,000 kg)
Payload to landing (return payload): 32,000 lb (14,400 kg)[8]
Maximum payload: 55,250 lb (25,060 kg)
Payload to LEO 204 kilometers (110 nmi) @ 28.5° inclination: 27,500 kilograms (60,600 lb)
Payload to LEO (407 kilometers (220 nmi) @ 51.6° to ISS): 16,050 kilograms (35,380 lb)[59]
Payload to GTO: 8,390 lb (3,806 kg)
Payload to polar orbit: 28,000 lb (12,700 kg)
Note launch payloads modified by External Tank (ET) choice (ET, LWT, or SLWT)
Payload bay dimensions (diameter by length): 15 by 59 ft (4.6 by 18 m)
Operational altitude: 100 to 520 nmi (190 to 960 km; 120 to 600 mi)
Speed: 7,743 m/s (27,870 km/h; 17,320 mph)
Crossrange: 1,085 nmi (2,009 km; 1,249 mi)
Main Stage (SSME with external tank)
Engines: 3 Rocketdyne Block II SSMEs, each with a sea level thrust of 393,800 lbf (1,752 kN) at 104% power
Thrust (at liftoff, sea level, 104% power, all 3 engines): 1,181,400 lbf (5,255 kN)
Specific impulse: 455 seconds (4.46 km/s)
Burn time: 480 s
Propellant: liquid hydrogen/liquid oxygen
Orbital Maneuvering System
Engines: 2 OMS engines
Thrust: 53.4 kN (12,000 lbf) combined total vacuum thrust
Specific impulse: 316 seconds (3.10 km/s)
Burn time: 150–250 s typical burn; 1250 s deorbit burn
Propellant: MMH/N2O4
Crew: varies
The earliest Shuttle flights had the minimum crew of 2; later missions used a crew of 5. By program end, typically 7 people would fly: (commander, pilot, several mission specialists, one of whom (MS-2) acted as the flight engineer starting with STS-9 in 1983). On two occasions, 8 astronauts have flown (STS-61-A, STS-71). In an emergency mission, 11 people could be accommodated (see STS-3xx).

External tank (for SLWT)

Length: 46.9 m (153.8 ft)
Diameter: 8.4 m (27.6 ft)
Propellant volume: 2,025 m3 (534,900 U.S. gal)
Empty weight: 26,535 kg (58,500 lb)
Gross liftoff weight (for tank): 756,000 kg (1,670,000 lb)

Solid Rocket Boosters

Length: 45.46 m (149 ft)
Diameter: 3.71 m (12.2 ft)
Empty weight (each): 68,000 kg (150,000 lb)
Gross liftoff weight (each): 571,000 kg (1,260,000 lb)
Thrust (at liftoff, sea level, each): 12,500 kN (2,800,000 lbf)
Specific impulse: 242 seconds (2.37 km/s)
Burn time: 124 s

System Stack

Height: 56 m (180 ft)
Gross liftoff weight: 2,000,000 kg (4,400,000 lb)
Total liftoff thrust: 30,160 kN (6,780,000 lbf)

Mission Profile

The Space Shuttle was prepared for launch primarily in the Vehicle Assembly Building (VAB) at the Kennedy Space Center (KSC). The SRBs were assembled from the sections they arrived in, and were attached to the external tank on the mobile launcher platform. The orbiter vehicle was prepared at the Orbiter Processing Facility and transferred to the VAB, where a crane was used to rotate it to the vertical orientation and mate it to the external tank. Once the entire stack was assembled, the mobile launcher platform was carried for 5.6 kilometers (3.5 mi) to Launch Complex 39 by one of the crawler-transporters. After the Space Shuttle arrived at one of the two launchpads, it would connect to the Fixed and Rotation Service Structures, which provided servicing capabilities, payload insertion, and crew transportation. The crew was transported to the launch pad at T-2 hours 30 minutes, and the side hatch was closed 30 minutes later after the crew entered the orbiter vehicle.LO2 and LH2 were loaded into the external tank via umbilicals that attached to the orbiter vehicle, which began at T-5 hours 35 minutes. At T-3 hours 45 minutes, the LH2 fast-fill was complete, followed 15 minutes later by the LO2. Both tanks were slowly filled up until the launch as the oxygen and hydrogen evaporated.

The weather criteria used for launch considered precipitation, temperatures, cloud cover, lightning forecast, wind, and humidity.The Space Shuttle was not launched under conditions where it could have been struck by lightning, as its exhaust plume could have triggered lightning by providing a current path to ground after launch, which occurred on Apollo 12.The NASA Anvil Rule for a Shuttle launch stated that an anvil cloud could not appear within a distance of 10 nautical miles (19 km).The Shuttle Launch Weather Officer monitored conditions until the final decision to scrub a launch was announced. Additionally, launch conditions required that the weather conditions was acceptable at one of the Transatlantic Abort Landing sites and the SRB recovery area.

Launch

The mission crew and the Launch Control Center (LCC) personnel completed systems checks throughout the countdown. Two built-in holds at T−20 minutes and T−9 minutes provided scheduled breaks to address any issues and additional preparation.After the built-in hold at T-9 minutes, the countdown was automatically controlled by the Ground Launch Sequencer (GLS) at the LCC, which stopped the countdown if it sensed a critical problem with any of the Space Shuttle's onboard systems.At T−3 minutes 45 seconds, the engines began conducting gimbal tests, which were concluded at T−2 minutes 15 seconds. The ground launch processing system handed off the control to the orbiter vehicle's GPCs at T−31 seconds. At T−16 seconds, the GPCs armed the SRBs, the sound suppression system (SPS) began to drench the mobile launcher platform (MLP) and SRB trenches with 1,100,000 liters (300,000 U.S. gal) of water to protect the orbiter vehicle from damage by acoustical energy and rocket exhaust reflected from the flame trench and MLP during lift off.At T−10 seconds, hydrogen igniters were activated under each engine bell to quell the stagnant gas inside the cones before ignition. Failure to burn these gases could trip the onboard sensors and create the possibility of an overpressure and explosion of the vehicle during the firing phase. The LH2 prevalves were opened at T−9.5 seconds in preparation for engine start.

Beginning at T−6.6 seconds, the main engines were ignited sequentially at 120 millisecond intervals. All three RS-25 engines were required to reach 90% rated thrust by T−3 seconds, otherwise the GPCs would initiate an RSLS abort. If all three engines indicated nominal performance by T−3 seconds, they were commanded to gimbal to liftoff configuration and the command would be issued to arm the SRBs for ignition at T−0.Between T−6.6 seconds and T−3 seconds, while the RS-25 engines were firing but the SRBs were still bolted to the pad, the offset thrust caused the Space Shuttle to pitch down 650 mm (25.5 in) measured at the tip of the external tank; the 3 second delay allowed the stack to return to nearly vertical before SRB ignition. At T−0 seconds, the eight frangible nuts holding the SRBs to the pad were detonated, the final umbilicals were disconnected, the SSMEs were commanded to 100% throttle, and the SRBs were ignited. By T+0.23 seconds, the SRBs built up enough thrust for liftoff to commence, and reached maximum chamber pressure by T+0.6 seconds.At T-0, the Johnson Space Center's (JSC) Mission Control Center assumed control of the flight from the LCC.

At T+4 seconds, when the Space Shuttle reached an altitude of 22 meters (73 ft), the RS-25 engines were throttled up to 104.5%. At approximately T+7 seconds, the Space Shuttle rolled to a heads-down orientation at an altitude of 110 meters (350 ft), which reduced aerodynamic stress and provided an improved communication and navigation orientation. Approximately 20-30 seconds into ascent and an altitude of 2,700 meters (9,000 ft), the RS-25 engines were throttled down to 65-72% to reduce the maximum aerodynamic forces at Max Q. Additionally, the shape of the SRB propellant was designed to cause thrust to decrease at the time of Max Q. The GPCs could dynamically control the throttle of the RS-25 engines based upon the performance of the SRBs.



At approximately T+123 seconds and an altitude of 46,000 meters (150,000 ft), pyrotechnic fasteners released the SRBs, which reached an apogee of 67,000 meters (220,000 ft) before parachuting into the Atlantic Ocean. The Space Shuttle continued its ascent using only the RS-25 engines. On earlier missions the Space Shuttle remained in the heads-down orientation to maintain communications with the tracking station in Bermuda, but later missions, beginning with STS-87, rolled to a heads up orientation at T+6 minutes for communication with the tracking and data relay satellite constellation. The RS-25 engines were throttled at T+7 minutes 30 seconds to limit vehicle acceleration to 3 g. At 6 seconds prior to main engine cutoff (MECO), which occurred at T+8 minutes 30 seconds, the RS-25 engines were throttled down to 67%. The GPCs controlled ET separation, and dumped the remaining LO2 and LH2 to prevent outgassing while in orbit. The ET continued on a ballistic trajectory and broke up during reentry, with some small pieces landing in the Indian or Pacific Ocean.

Early missions used two firing of the OMS to achieve orbit; the first firing raised the apogee while the second circularized the orbit. Missions after STS-38 used the RS-25 engines to achieve the optimal apogee, and used the OMS engines to circularize the orbit. The orbital altitude and inclination were mission dependent, and the Space Shuttle's orbits varied from 120 NM to 335 NM.

In orbit

The type of mission that the Space Shuttle was assigned to dictated the type of orbit that it entered. The initial design of the reusable Space Shuttle envisioned an increasingly cheap launch platform to deploy commercial and government satellites. Early missions routinely ferried satellites, which determined the type of orbit that the orbiter vehicle would enter. Following the Challenger disaster, many commercial payloads were moved to expendable commercial rockets, such as the Delta II. While later missions still launched commercial payloads, Space Shuttle assignments were routinely directed towards scientific payloads, such as the Hubble Space Telescope, Spacelab, and the Galileo spacecraft. Beginning with STS-74, the orbiter vehicle conducted dockings with the Mir space station. In its final decade of operation, the Space Shuttle was used for the construction of the International Space Station.Most missions involved staying in orbit several days to two weeks, although longer missions were possible with the Extended Duration Orbiter pallet. The 17 day 15 hour STS-80 mission was the longest Space Shuttle mission duration.

Re-entry And Landing

Approximately four hours prior to deorbit, the crew began preparing the orbiter vehicle for reentry by closing the payload doors, radiating excess heat, and retracting the Ku-band antenna. The orbiter vehicle maneuvered to an upside down, tail first orientation and began a 2-4 minute OMS burn approximately 20 minutes before it reenter the atmosphere. The orbiter vehicle reoriented itself to a nose-forward position with a 40° angle-of-attack, and the forward RCS jets were emptied of fuel and disabled prior to reentry. The orbiter vehicle's reentry was defined as starting at an altitude 400,000 ft (120 km), when it was traveling approximately Mach 25. The orbiter vehicle's reentry was controlled by the GPCs, which followed a preset angle-of-attack plan to prevent unsafe heating of the TPS. The GPCs also controlled the multiple aerobraking S-turns, using only the roll axis, to dissipate excess speed without changing the angle-of-attack.

The orbiter vehicle's aft RCS jets were disabled as it descended and its ailerons, elevators, and rudder became effective in the lower atmosphere. At an altitude of 150,000 ft (46 km), the orbiter vehicle opened its speed brake on the vertical stabilizer. At 8 minutes 44 seconds prior to landing, the crew deployed the air data probes, and began lowering the angle-of-attack to 36°. The orbiter's maximum glide ratio/lift-to-drag ratio varied considerably with speed, ranging from 1:1 at hypersonic speeds, 2:1 at supersonic speeds and reaching 4.5:1 at subsonic speeds during approach and landing. The orbiter vehicle flew to one of the two Heading Alignment Cones, located 48 kilometers (30 mi) away from each end of the runway's centerline, where it made its final turns to dissipate excess energy prior to its approach and landing. Once the orbiter vehicle was traveling subsonically, the crew took over manual control of the flight.

The approach and landing phase began when the orbiter vehicle was at an altitude of 3,000 meters (10,000 ft) and traveling at 150 meters per second (300 kn). the orbiter vehicle followed either a -20° or -18° glideslope and descended at approximately 51 meters per second (167 ft/s). The speed brake was used to keep a continuous speed, and crew initiated a pre-flare maneuver to a -1.5° glideslope at an altitude of 610 meters (2,000 ft). The landing gear was deployed 10 seconds prior to touchdown, when the orbiter was at an altitude of 91 meters (300 ft) and traveling 150 meters per second (288 kn). A final flare maneuver reduced the orbiter vehicle's descent rate to 0.9 meters per second (3 ft/s), with touchdown occurring at 100–150 meters per second (195–295 kn), depending on the weight of the orbiter vehicle. After the landing gear touched down, the crew deployed a drag chute out of the vertical stabilizer, and began wheel braking when the orbiter vehicle was traveling slower than 72 meters per second (140 kn). After wheels stop, the crew deactivated the flight components and prepared to exit.

Landing Sites

The primary Space Shuttle landing site was the Shuttle Landing Facility at Kennedy Space Center. In the event of unfavorable landing conditions, the Shuttle could delay its landing or land at an alternate location. The primary alternate was Edwards AFB, which was used for 54 landings.STS-3 landed at the White Sands Space Harbor in New Mexico and required extensive post-processing after exposure to the gypsum-rich sand, some of which were found in Columbia debris after STS-107. Landings at alternate airfields required the Shuttle Carrier Aircraft to transport the orbiter back to Cape Canaveral.

In addition to the pre-planned landing airfields, there were 85 agreed-upon emergency landing sites to be used in different abort scenarios, with 58 located in other countries. The landing locations were chosen based upon political relationships, favorable weather, a runway at least 7,500 feet (2,300 m) long, and TACAN or DME equipment. Additionally, as the orbiter vehicle only had UHF radios, international sites with only VHF radios would have been unable to communicate directly with the crew. Facilities on the east coast of the US were planned for East Coast Abort Landings, while several sites in Europe and Africa were planned in the event of a Transoceanic Abort Landing. The facilities were prepared with equipment and personnel in the event of an emergency shuttle landing, but were never used.

Post-Landing Processing

After landing, the vehicle stayed on the runway for several hours for the orbiter to cool. Teams at the front and rear of the orbiter tested for presence of hydrogen, hydrazine, monomethylhydrazine, nitrogen tetroxide and ammonia (fuels and by-products of the reaction control system and the orbiter's three APUs). If hydrogen was detected, an emergency would be declared, the orbiter powered down and teams would evacuate the area. A convoy of 25 specially designed vehicles and 150 trained engineers and technicians approached the orbiter. Purge and vent lines were attached to remove toxic gases from fuel lines and the cargo bay about 45–60 minutes after landing. A flight surgeon boarded the orbiter for initial medical checks of the crew before disembarking. Once the crew left the orbiter, responsibility for the vehicle was handed from the Johnson Space Center back to the Kennedy Space Center.

If the mission ended at Edwards Air Force Base in California, White Sands Space Harbor in New Mexico, or any of the runways the orbiter might use in an emergency, the orbiter was loaded atop the Shuttle Carrier Aircraft, a modified 747, for transport back to the Kennedy Space Center, landing at the Shuttle Landing Facility. Once at the Shuttle Landing Facility, the orbiter was then towed 2 miles (3.2 km) along a tow-way and access roads normally used by tour buses and KSC employees to the Orbiter Processing Facility where it began a months-long preparation process for the next mission.

Accidents

On January 28, 1986, Challenger disintegrated 73 seconds after launch due to the failure of the right SRB, killing all seven astronauts on board. The disaster was caused by low-temperature impairment of an O-ring, a mission critical seal used between segments of the SRB casing. Failure of the O-ring allowed hot combustion gases to escape from between the booster sections and burn through the adjacent external tank, leading to a sequence of events which caused the orbiter to disintegrate.Repeated warnings from design engineers voicing concerns about the lack of evidence of the O-rings' safety when the temperature was below 53 °F (12 °C) had been ignored by NASA managers.

On February 1, 2003, Columbia disintegrated during re-entry, killing its crew of seven, because of damage to the carbon-carbon leading edge of the wing caused during launch. Ground control engineers had made three separate requests for high-resolution images taken by the Department of Defense that would have provided an understanding of the extent of the damage, while NASA's chief thermal protection system (TPS) engineer requested that astronauts on board Columbia be allowed to leave the vehicle to inspect the damage. NASA managers intervened to stop the Department of Defense's assistance and refused the request for the spacewalk,and thus the feasibility of scenarios for astronaut repair or rescue by Atlantis were not considered by NASA management at the time.


Retirement

NASA retired the Space Shuttle in 2011, after 30 years of service. The Shuttle was originally conceived of and presented to the public as a "Space Truck", which would, among other things, be used to build a United States space station in low Earth orbit in the early 1990s. When the U.S. space station evolved into the International Space Station project, which suffered from long delays and design changes before it could be completed, the retirement of the Space Shuttle was delayed several times until 2011, serving at least 15 years longer than originally planned. Discovery was the first of NASA's three remaining operational Space Shuttles to be retired.

The final Space Shuttle mission was originally scheduled for late 2010, but the program was later extended to July 2011 when Michael Suffredini of the ISS program said that one additional trip was needed in 2011 to deliver parts to the International Space Station.STS-135 launched on July 8, 2011, and landed at the KSC on July 21, 2011, at 5:57 a.m. EDT (09:57 UTC).

Distribution Of Orbiters And Other Hardware

NASA announced it would transfer orbiters to education institutions or museums at the conclusion of the Space Shuttle program. Each museum or institution is responsible for covering the US$28.8 million cost of preparing and transporting each vehicle for display. Twenty museums from across the country submitted proposals for receiving one of the retired orbiters.NASA also made Space Shuttle thermal protection system tiles available to schools and universities for less than US$25 each.About 7,000 tiles were available on a first-come, first-served basis, limited to one per institution.

Orbiters On Display

On April 12, 2011, NASA announced selection of locations for the remaining Shuttle orbiters:

Atlantis is on display at the Kennedy Space Center Visitor Complex.

iscovery is on display at the Udvar-Hazy Center of the Smithsonian Institution's National Air and Space Museum in Chantilly, Virginia. Prior to its delivery in April 2012, it was flown atop a Shuttle Carrier Aircraft, escorted by a NASA T-38 Talon, over and around Washington, D.C., and landed at Washington Dulles International Airport.

Endeavour was delivered to the California Science Center in Los Angeles, California on October 14, 2012. It arrived at Los Angeles International Airport on September 21, 2012 escorted by two NASA F/A-18 Hornet chase aircraft, concluding a two-day, cross country journey atop the Shuttle Carrier Aircraft after stops at Ellington Field in Houston, Biggs Army Airfield in El Paso, Texas, and the Dryden Flight Research Facility at Edwards Air Force Base, California.
Enterprise was on display at the National Air and Space Museum's Udvar-Hazy Center prior to the arrival of Discovery and was moved to New York City's Intrepid Sea-Air-Space Museum in 2012.
Independence, formerly known as Explorer, is a full-scale, high-fidelity replica of the Space Shuttle. It was built by Guard-Lee in Apopka, Florida, installed at Kennedy Space Center Visitor Complex in 1993, and moved to Space Center Houston in 2012. It was built using schematics, blueprints and archival documents provided by NASA and by shuttle contractors such as Rockwell International. While many of the features on the replica are simulated, some parts, including the landing gear's Michelin tires, have been used in the Space Shuttle program.The model is on display, mounted on top of the original Shuttle Carrier Aircraft (NASA 905) outside of the Visitors' Center.
Pathfinder is a Space Shuttle test simulator made of steel and wood. Constructed by NASA in 1977 as an unnamed test article, it was purchased in the early 1980s by the America-Japan Society, Inc. which had it refurbished, named it, and placed it on display in the Great Space Shuttle Exhibition in Tokyo. The mockup was later returned to the United States and placed on permanent display at the U.S. Space & Rocket Center in Huntsville, Alabama, in May 1988.

Hardware On Display

One of the Crew Compartment Trainer (CCT) Flight and mid-deck training hardware is on display at the National Museum of the U.S. Air Force, while the other remains on display at the JSC. The Full Fuselage Trainer (FFT), which includes the payload bay and aft section but no wings, went to the Museum of Flight in Seattle, Washington. The Mission Simulation and Training Facility's Shuttle Mission Simulator Fixed Base Simulator went to the Adler Planetarium in Chicago, Illinois but due to funding issues was later transferred to the Stafford Air & Space Museum in Weatherford, Oklahoma;the Motion Base Simulator went to the Texas A&M Aerospace Engineering Department in College Station, Texas, where it remains in storage awaiting funding or other disposition;and the Guidance and Navigation Simulator (GNS) went to the Wings of Dreams Aviation Museum in Starke, Florida.One of the Single System Trainers (SSTs) used in Shuttle astronaut training went to the Virginia Air and Space Center in Hampton, Virginia, the other two remain on display at the JSC.


Post a Comment

Note: Only a member of this blog may post a comment.

favourite category

...
BREAKING NEWS

Whatsapp Button works on Mobile Device only